Building the AI-native operating system for distributed solar and storage.
Silicon solar modules and lithium-iron-phosphate battery cells have already commoditized globally, yet U.S. residential installations still cost nearly three times international benchmarks because roughly 60% of the price tag is trapped in non-hardware soft costs. Potrero Energy is a vertically integrated California installer-operator built from the ground up on Potrero OS to collapse those soft costs, hit $2.00/W and $0.50/Wh, and compound installed prices down by 5% every year.
Fully installed solar target vs. $3.25–$3.80+/W typical California incumbent pricing.
$500/kWh all-in target (already achieving ~$295/kWh on marginal 48V battery expansion blocks).
Year-over-year installed price reduction driven by AI workflow automation and crew density.
Payback threshold in California where solar + storage shifts from a high-CAC “sold” product to organic demand.
Why California is our only aspiration.
Many solar companies destroy their unit economics by chasing multistate expansion into $0.14/kWh utility territories where 14-year paybacks require aggressive door-to-door sales forces. We have zero interest in leaving California.
In California—an economy the size of a G7 nation with nearly 14 million housing units—retail investor-owned utility rates have climbed to $0.45–$0.65+ per kWh (+104% over the past decade at PG&E), paired with steep evening time-of-use spreads under NEM 3.0, high solar irradiance, rapid EV and heat-pump adoption, and recurring grid outages.
Because California’s avoided electricity cost is more than double most global markets, we do not need Australia’s $0.95/W price tag to achieve Australia’s 4-to-5-year payback. At $2.00/W and $0.50/Wh (and falling 5% per year), California homeowners cross the consistent 5-year payback threshold (~20% annual tax-free yield on capital). At a 5-year payback, solar and storage stop being an agonizing financial product that has to be sold at the kitchen table and become an obvious word-of-mouth utility upgrade—collapsing customer acquisition cost in a self-reinforcing flywheel.
Why $2.00/W + $0.50/Wh unlocks a 5-year payback in California
| Market | Retail Rate | Installed Cost | Typical Payback |
|---|---|---|---|
| U.S. Non-CA AverageLow utility rate trap | ~$0.16 / kWh | ~$3.25/W · $1.00/Wh | 12–16+ yrs |
| CA Legacy Incumbent60% soft-cost bloat | $0.45–$0.65 / kWh | ~$3.50/W · $1.10/Wh | 8–11 yrs |
| Australia BenchmarkLow soft costs, lower rates | ~$0.22–$0.28 / kWh | ~$0.95/W · $0.28/Wh | 4–5 yrs |
| Potrero California TargetHigh rates + gutted soft costs | $0.45–$0.65 / kWh | $2.00/W · $0.50/Wh | ~4.5–5.5 yrs |
When paired with our in-house Prepaid Energy Service (which captures the 30% Section 48E commercial tax credit on Day 1 and shields the homeowner from California property-tax reassessment), net customer economics compress even further.
A 5% annual cost reduction: passing Europe and closing the gap with Australia.
Starting from a baseline target of $2.00/W for solar and $0.50/Wh for battery storage, a disciplined 5% annual price reduction—driven by increasing AI operational automation, repeat crew density, and direct hardware procurement—takes Potrero below European residential installed pricing within 3 to 5 years and converges toward Australia’s global frontier over the decade.
Installed Solar Trajectory ($2.00/W → $1.20/W)
| Milestone | Target Y0 | Year +3 | Year +5 (Passes EU) | Year +10 | Global Frontier (AU) |
|---|---|---|---|---|---|
| Potrero Solar ($ / W) | $2.00/W | $1.71/W | $1.55/W (vs. ~$1.55 EU) | $1.20/W | ~$0.95/W |
| Potrero Storage ($ / Wh) | $0.50/Wh | $0.43/Wh (vs. ~$0.43 EU) | $0.39/Wh | $0.30/Wh | ~$0.28/Wh |
How Bigger, Smarter, and custom business logic work together to gut soft costs.
According to NREL and Berkeley Lab, roughly 60% of a U.S. residential solar-and-battery price tag consists of soft costs. Eliminating that bloat is an ongoing engineering campaign across every layer of our business—combining our customer-facing pillars with purpose-built software logic inside Potrero OS:
Amortizing fixed site soft costs over 3× larger systems.
- Fixed-overhead dilution per Wh: Site survey, engineering plan sets, AHJ permit fees, utility interconnection, and crew mobilization cost nearly the same whether a home installs 14 kWh or 48 kWh. Standardizing on modular 48V LFP storage (32–64+ kWh) cuts fixed soft cost per kWh by more than half on Day 1.
- Eliminating $10k–$30k PG&E 200A service upgrades: By treating a 16–21 kW hybrid inverter and battery bank as a second on-site power supply paired with UL 1741 PCS current limiting and modular Eaton AbleEdge smart breakers (2025 CEC §§ 220.70 / 705.13), we keep 100A and 125A Bay Area homes out of 12-month PG&E trenching queues.
Cutting out financier dealer fees, AVL markups & roof complexity.
- In-house Section 48E Prepaid Energy Service: National lease/PPA financiers and solar loan providers extract 15%–30% in dealer fees, enforce restrictive Approved Vendor Lists, and freeze installer working capital behind 40–60 photo audit portals. Running our own commercial tax-credit and R&TC § 2188.2 property-tax shield structure in-house removes the financier middleman entirely.
- Fewer rooftop failure points: Bay Area–made Optivolt modules use built-in cell-level shade optimization, eliminating 20+ rooftop microinverters per job and reducing both roof labor hours and 25-year truck-roll warranty exposure.
Replacing sales commissions & back-office glue with code.
- Self-serve satellite + 288-period rate engine: Replaces $4,000–$8,000 door-to-door sales commissions with an instant online estimate calibrated against 300 NREL homes, leading directly into a 30-minute engineer video consultation.
- Deterministic single-graph engineering: One in-memory calculation graph generates the customer proposal, 160-SKU bill of materials, NEC electrical schedules, subcontractor milestone payouts, and 1-click Google Docs contracts (MCA, CCO, SCO, Installation POs, and statutory lien waivers).
- City-by-city AHJ & SolarAPP+ rule encoding: Checks instant-permit eligibility, garage ESS clearances, and panel derates at quote time to prevent plan-check rejections and surprise change orders.
Built from the ground up with AI workflows—and gradually increasing AI autonomy responsibly.
Historically, an installer had two bad software choices: rent a fragmented patchwork of rigid third-party SaaS tools that don’t talk to each other, or burn tens of millions of dollars hiring a large software engineering department before reaching scale. By building Potrero OS from scratch using modern agentic AI development workflows, our team ships and refines custom ERP, CRM, engineering, and field-operations software at a fraction of traditional R&D cost.
In operations, we apply a strict engineering principle: deterministic code for physics, electrical safety, and contract math; AI for synthesis, verification, and workflow orchestration—gradually expanding AI reliance as each stage proves its reliability alongside licensed human oversight.
AI-Built Deterministic Core + Co-Pilot Synthesis
Agentic AI workflows accelerate our software development velocity, while in production AI extracts proposal parameters from consultation call transcripts, summarizes multi-channel Quo/Gmail threads, and drafts sales-to-PM engineering handoff briefs. Every price, NEC load calculation, BoM, and legal contract is governed by deterministic, unit-tested TypeScript and reviewed by our team.
Agentic Field Verification & Permitting Triage
Increasing AI reliance across project management: automated site-survey photo and measurement verification against CEC clearances, pre-screening electrical panel and conduit runs before equipment ships, proactive working-design drift alerts, and automated subcontractor milestone and lien-waiver compliance checks.
Near-Zero Marginal Back-Office & Autonomous Fleet
Touchless SolarAPP+ permit package submission, automated distributor purchase-order execution tied to inspection milestones, predictive telemetry diagnostics across our 25-year installed fleet, and autonomous Virtual Power Plant (VPP) bidding and dispatch across California grid programs.